You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
forecast initialized from observations with forcing from ssp245
Description
CMIP6 DCPP (Boer et al., 2016; www.geosci-model-dev.net/9/3751/2016/) experiments B1 (and B2.1, B2.2)--ongoing fully-coupled decadal forecasts initialized from observation-based states. First full forecast year follows start year (e.g., for 2025 initialization, first full forecast year is 2026). This AR7 FastTrack experiment is a real-time extension of CMIP6 DCPP component B, so a pre-requisite is completion of CMIP6 DCPP component A (experiment id: dcppA-hindcast). For participation in AR7, forecasts should be 10 years long with minimum of 10 ensemble members.
MIP / Activity ID (registered)
DCPP
MIP / Activity ID (unregistered)
No response
Parent Experiment
no-parent
Custom Parent Experiment
dcppA-assim (from CMIP6)
Sub-experiment
"none" (if following CMIP7 CV) but "s2025" (if following CMIP6 CV)
Priority Tier
1
Source type codes for required model components
AOGCM
Source type codes for additional allowed model components
AER, BGC, CHEM, ISM
Start Date
2026, 2027
Branch Date
No response
(Minimum) Number of Years
(10 sim-years)x(10 ensemble members) = 100 years
Issue Type
experiment
Issue Kind
new
The text was updated successfully, but these errors were encountered:
Experiment ID
dcppB-forecast-cmip6
Experiment Title
forecast initialized from observations with forcing from ssp245
Description
CMIP6 DCPP (Boer et al., 2016; www.geosci-model-dev.net/9/3751/2016/) experiments B1 (and B2.1, B2.2)--ongoing fully-coupled decadal forecasts initialized from observation-based states. First full forecast year follows start year (e.g., for 2025 initialization, first full forecast year is 2026). This AR7 FastTrack experiment is a real-time extension of CMIP6 DCPP component B, so a pre-requisite is completion of CMIP6 DCPP component A (experiment id: dcppA-hindcast). For participation in AR7, forecasts should be 10 years long with minimum of 10 ensemble members.
MIP / Activity ID (registered)
DCPP
MIP / Activity ID (unregistered)
No response
Parent Experiment
no-parent
Custom Parent Experiment
dcppA-assim (from CMIP6)
Sub-experiment
"none" (if following CMIP7 CV) but "s2025" (if following CMIP6 CV)
Priority Tier
1
Source type codes for required model components
AOGCM
Source type codes for additional allowed model components
AER, BGC, CHEM, ISM
Start Date
2026, 2027
Branch Date
No response
(Minimum) Number of Years
(10 sim-years)x(10 ensemble members) = 100 years
Issue Type
experiment
Issue Kind
new
The text was updated successfully, but these errors were encountered: