- Level 1: Basic Principles Observed and Reported
- Level 2: Potential Application Validated
- Level 3: Proof-of-Concept Demonstrated, Analytically and/or Experimentally
- Level 4: Component and/or Breadboard Laboratory Validated
- Level 5: Component and/or Breadboard Validated in Simulated or Realspace Environment
- Level 6: System Adequacy Validated in Simulated Environment
- Level 7: System Adequacy Validated in Space
- Material solutions analysis
- Material development decision review
-
- Basic manufacturing implications identified
-
- Manufacturing concepts identified
-
- Manufacturing proof of concept developed
-
- Milestone A decision
-
- Capability to produce the technology in a laboratory environment
-
- Material development decision review
- Technology maturation and risk reduction (formerly "technology development")
- Milestone B decision
-
- Capability to produce prototype components in a production relevant environment
-
- Capability to produce a prototype system or subsystem in a production relevant environment
-
- Milestone B decision
- Engineering and manufacturing development
- post-CDR (Critical design review) Assessment
-
- Capability to produce systems, subsystems or components in a production representative environment
-
- Milestone C decision
-
- Pilot line capability demonstrated. Ready to begin low rate production
-
- post-CDR (Critical design review) Assessment
- Production and Deployment
- Full rate production decision
-
- Low rate production demonstrated. Capability in place to begin Full Rate Production
-
- Full rate production decision
- Operations and Support
-
- Full rate production demonstrated and lean production practices in place
-