Notifications
You must be signed in to change notification settings - Fork 1
/
Copy pathObjective_LI_DE.m
337 lines (290 loc) · 15.2 KB
/
Objective_LI_DE.m
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
function [cost] = Objective_LI_DE(x)
% Function performs optimal dispatch to output overall weighted cost function that needs to be minimized
% Variable inputs (that we minimize w.r.t) are:
% no. of solar PV arrays, no. of wind turbines, initial battery capacity (in kWh)
n_s = x(1);
n_w = x(2);
Eb_init = x(3);
% Given fixed inputs: Wind speed, ambient external air temperature, solar radiation, electricity demand
% Have all of this data available over a whole year with hourly resolution
% LOAD ALL FIXED EXTERNAL/EXOGENOUS INPUT VARIABLES
load('irradiance.mat'); % Solar insolation/irradiance (kW/m^2)
load('temp.mat'); % Ambient air temperature (C)
load('wind_speed.mat'); % (m/s)
load('Load.mat'); % Hourly power (kW) demand profiles
% Hourly energy demand profile = power demand * time interval
% Initialize variables
P_s = zeros(1,8760); % (kW)
P_w = zeros(1,8760); % (kW)
P_DE = zeros(1,8760); % (kW)
P_b_LI = zeros(1,8760); % (kW)
P_RES = zeros(1,8760); % (kW)
P_dump = zeros(1,8760); % Excess power (RES output) sent to dump loads/ground (kW)
soc_LI = zeros(1,8761); % between 0 and 1
DE_ON = zeros(1,8760); % Boolean variable to keep track of whether DE is online/committed
% Lost load or Amount of demand response (curtailment/shifting) needed to balance MG
P_lost = zeros(1,8760);
% COSTS
i = 0.1; % Nominal interest/discount rate (from NREL LCOE explorer)
f = 0.035; % Inflation/escalation rate (https://tradingeconomics.com/tanzania/inflation-cpi)
r = (i-f)/(1+f); % Real discount/interest rate
t_overall = 25; % Overall system lifetime (y) = lifetime of solar (longest surviving components)
CRF = (r*(1+r)^t_overall)/((1+r)^t_overall - 1); % Capital recovery factor
% Startup and shutdown costs of conventional generators
DE_startup = 0;
DE_shutdown = 0;
% Variable O&M costs of DE
Var_OM_DE = 0;
% Fuel costs
C_fuel_DE = 0;
CO2 = 0;
% Fixed system parameters
% SOLAR
% PV panel specs from https://www.mitsubishielectricsolar.com/images/uploads/documents/specs/MLU_spec_sheet_250W_255W.pdf
% For 255 W system - Monocrystalline Si
eta_r = 0.154; % Manufacturer rated efficiency
T_r = 25; % Standard test conditions (reference cell temperature)
I_PV_NOCT = 0.8; % Hourly solar irradiance at NOCT - Normal/nominal operating cell temp (in kW/m^2)
T_c_NOCT = 45.7; % PV cell temp at NOCT (Celsius)
T_a_NOCT = 20; % Ambient temp at NOCT (Celsius)
beta_s = 0.0045; % Temp coefficient of module/generator efficiency (midway between the Pmax and Voc coefficients)
t_s = 25; % Lifetime of solar PV array (y)
Ps_rated = 255; % Rated max power of each module (W)
eta_pc = 1; % Power conditioning efficiency (= 1 or 100% since it's assumed that a perfect MPPT is used)
Ps_rated_total = n_s * Ps_rated; % Total solar PV installed capacity in microgrid (W)
IC_s = (Ps_rated_total/1000) * 1750; % Assuming installed PV costs of $1750/kW (source: IRENA costs report 2018, total installed costs)
OM_s = (1/100)*IC_s; % Fixed annual O&M costs ($/y) - from Kaabeche et al. 2011a
% WIND
beta_w = 1/7; % Typical value of power law exponent for open land
% Use data from this spec sheet: https://farm-energy.extension.org/wp-content/uploads/2019/04/3.5kW_Spec_Sheet.pdf
h_ref = 2; % Installation height of TAHMO measurement stations (m)
h_hub = 14.5; % Tower height to hub/nacelle (m)
Pw_rated = 3.5; % Rated power of each WT (kW)
Pw_rated_total = n_w * Pw_rated;
IC_w = Pw_rated_total * 1500; % Assuming installed PV costs of $1500/kW (source: IRENA costs report 2018, total installed costs)
OM_w = (3/100)*IC_w; % Fixed annual O&M costs ($/y)
t_w = 20; % Lifetime of wind turbine system (y)
v_c = 2.8; % Cut-in speed (m/s)
v_r = 11; % Rated wind speed (m/s)
v_f = 22; % Cut-out or failure speed (m/s)
A = (1/(v_c^2 - v_r^2)) * (v_c*(v_c + v_r) - 4*v_c*v_r*((v_c + v_r)/(2*v_r))^3);
B = (1/(v_c^2 - v_r^2)) * (4*(v_c + v_r)*((v_c + v_r)/(2*v_r))^3 - 3*(v_c + v_r));
C = (1/(v_c^2 - v_r^2)) * (2 - 4*((v_c + v_r)/(2*v_r))^3);
% Li-ion battery system - from https://www.nrel.gov/docs/fy16osti/64987.pdf
% Updated parameters for powerwall - https://www.tesla.com/en_GB/powerwall
SOC_min_LI = 0.1;
SOC_max_LI = 0.9; % DoD for LI = 80% (https://www.spiritenergy.co.uk/kb-batteries-understanding-batteries)
delta = 0.075; % Self-discharge rate of battery (7.5%/month)
P_max_LI = 3.68; % Max continuous real power (kW), 5 kW peak
delta_hour = delta/30.5; % Hourly self-discharge rate (%/h)
eta_overall = 0.90; % Battery round trip coulombic efficiency (accounts for both charge & discharge) - from Hu et al. 2017
cycles_LI = 0; % Keeps track of cumulative no. of charge/discharge cycles so far
IC1_LI = 520; % Initial capital energy/capacity costs ($/kWh)
IC2_LI = 120; % Initial capital power costs ($/kW) - source?
IC_LI = IC1_LI * Eb_init + IC2_LI * P_max_LI; % Total initial capital costs for LI
OM_LI = (1/100) * IC_LI; % from Kaabeche et al. 2011a ($/y)
RC_LI = 0.9*IC_LI; % Replacement cost at end of service period/lifetime
Eb_init = Eb_init*3.6e6; % 1 W = 1 J/s
E_C = Eb_init; % Actual capacity is initially at rated maximum (J)
t_LI = 10; % Average lifetime of Li-ion battery (y) - Tesla powerwall warranty
% Diesel generator specs from Moshi et al. 2016
P_DE_rated = 16; % Rated maximum power of diesel generator (kW) = approx. peak load * 1.5
P_DE_min = 4.8; % Lower limit on power (kW) or k_gen * P_rated (k_gen = 0.3) from Fathima et al.
Ramp = (P_DE_rated*1000)/10; % Max ramp rate of DE (W/min) - NERC disturbance control standard
% Ramp_up = 0.006038 - 0.000003840*(P_DE_rated/10e3); % from ramp_rates.pdf (as % of nameplate capacity per minute)
% Ramp_down = 0.006783 - 0.000004314*(P_DE_rated/10e3);
IC_DE = 12500; % Initial capital cost ($)
RC_DE = 11000; % Replacement cost ($)
Fixed_OM_DE = (2/100)*IC_DE; % Fixed O&M costs ($/y)
Variable_OM_DE = 0.24; % Variable O&M costs ($/h of operation online)
SUC_DE = 0.45; % Start-up cost ($/kW)
SDC_DE = 0.23; % Shut-down cost ($)
t_DE = 5; % Average lifetime of diesel engine (y) - source?
% t_DE = 15000; % Lifetime (h), from Moshi et al. 2016
% Bidirectional inverter between AC and DC buses (can act as either rectifier or inverter)
eta_inv = 0.9; % Inverter efficiency (Ogunjuyigbe et al. 2016)
eta_rec = eta_inv; % Both rectifier and inverter assumed to have same parameters (Moshi et al. 2016)
t_inv = 10; % Lifetime of converter
P_inv_rated = 16; % Maximum rated power of inverter (kW) - chosen to be same as that of backup generator
IC_inv = 0.715 * P_inv_rated; % Assuming unit price of $0.715/W
% Assume converter has zero maintenance costs
% Start with delta_t = 1 h and then maybe discretize over smaller time intervals
delta_t = 3600; % Calculation period (s) = 1 hour
hour = 0; % Keeps track of the hour in the day
% Normalize emissions wrt a base case where the DE is continuously run for the whole year at rated power - to meet all the load
fuel_DE = 8760 * 0.06 * P_DE_rated + 0.0246 * sum(sum(Load));
CO2 = 3.5 * fuel_DE;
CO = 4.063288937 * sum(sum(Load));
NOx = 18.85658039 * sum(sum(Load));
SO2 = 0.007381439 * sum(sum(Load));
VOC = 1.502443664 * sum(sum(Load));
PM = 1.338208931 * sum(sum(Load));
PM10 = 1.338208931 * sum(sum(Load));
PM25 = 1.338208931 * sum(sum(Load));
Emissions_base = CO2 + (CO + NOx + SO2 + VOC + PM + PM10 + PM25)/1000; % (kg)
CO2 = 0;
for t = 1:1:8760 % Simulate over one year with a time-step of 1 h
Excess_demand = 0;
% SOLAR - How does Ps_rated affect these calculations?
I = irradiance(t); % Hourly solar irradiance (kW/m^2)
T_a = temp(t);
eta_PV = eta_r * (1 - 0.9 * beta_s * (I/I_PV_NOCT) * (T_c_NOCT - T_a_NOCT) - beta_s * (T_a - T_r)); % Tazvinga et al. 2013
% Alternative model - Kaabeche et al. 2011b
T_c = T_a + ((T_c_NOCT - 20)/0.8)*I; % Cell temp (C)
% eta_PV = eta_r * eta_pc * (1 - beta_s*(T_c - T_r));
% A_c = 1.625 * 1.019; % Surface area of 1 panel rated at 255 W (m^2)
A_c = 120 * 78e-3 * 156e-3; % Surface area of 1 panel rated at 255 W (m^2)
P_s(t) = n_s * eta_PV * A_c * I; % Solar power output (kW)
% if (P_s(t) > Ps_rated_total)
% P_s(t) = Ps_rated_total;
% end
% WIND
v_ref = wind_speed(t);
v_hub = v_ref * (h_hub/h_ref)^beta_w; % Wind speed at hub calculated from measured speed at reference anemometer height
% From Borhanazad et al. 2014: Optimization of micro-grid system using MOPSO
if (v_hub < v_c || v_hub > v_f)
P_w(t) = 0;
elseif (v_c <= v_hub && v_hub <= v_r)
P_w(t) = n_w * Pw_rated * (A + B * v_hub + C * v_hub^2);
% Alternative formula
% Pw = ((v_hub^3)*P_rated - P_rated*v_cutin^3)/(v_rated^3 - v_cutin^3);
else
P_w(t) = n_w * Pw_rated; % Wind power output (kW)
end
P_RES(t) = P_w(t)*eta_rec + P_s(t); % Total renewable power output available at DC bus (kW)
% BATTERY
% Assume battery starts out fully charged (at max safe SOC)
if (t == 1)
soc_LI(t) = 0.9;
end
if (soc_LI(t) > SOC_max_LI)
soc_LI(t) = SOC_max_LI;
end
if (soc_LI(t) < SOC_min_LI)
soc_LI(t) = SOC_min_LI;
end
if (t ~= 1 && soc_LI(t) == SOC_max_LI && soc_LI(t-1) < SOC_max_LI) % Complete 1 charge-discharge cycle
cycles_LI = cycles_LI + 1; % Increment cycle number
E_C = Eb_init*(1 - (cycles_LI*0.055e-3)); % Capacity fading with cycling - https://www.nrel.gov/docs/fy16osti/64987.pdf
end
day_number = ceil(t/24);
if (hour >= 24)
hour = 0;
end
hour = hour + 1;
P_load = Load(day_number,hour); % (kW)
if (P_RES(t) == P_load/eta_inv)
continue
elseif (P_RES(t) > P_load/eta_inv) % Excess supply/generation
if (soc_LI(t) >= SOC_max_LI) % Battery can't be charged further
P_dump(t) = P_RES(t) - P_load/eta_inv; % Send excess power to dump loads/ground
else % Charge battery system
if (P_RES(t) - P_load/eta_inv <= P_max_LI)
P_b_LI(t) = -(P_RES(t) - P_load/eta_inv);
soc_LI(t+1) = soc_LI(t)*(1-delta_hour) - P_b_LI(t)*1000*delta_t*(eta_overall/E_C);
else
P_b_LI(t) = -P_max_LI;
soc_LI(t+1) = soc_LI(t)*(1-delta_hour) - P_b_LI(t)*1000*delta_t*(eta_overall/E_C);
P_dump(t) = P_RES(t) - P_load/eta_inv - P_max_LI;
end
end
else % Insufficient supply/generation
Excess_demand = P_load/eta_inv - P_RES(t);
if (soc_LI(t) > SOC_min_LI) % Discharge battery
if (Excess_demand <= P_max_LI)
P_b_LI(t) = Excess_demand;
soc_LI(t+1) = soc_LI(t)*(1-delta_hour) - P_b_LI(t)*1000*delta_t*(eta_overall/E_C);
Excess_demand = 0; % All load has been met/satisfied
else
P_b_LI(t) = P_max_LI;
soc_LI(t+1) = soc_LI(t)*(1-delta_hour) - P_b_LI(t)*1000*delta_t*(eta_overall/E_C);
Excess_demand = Excess_demand - P_max_LI;
end
elseif (Excess_demand > 0) % Need to use backup DE to meet excess load
DE_ON(t) = 1; % Turn DE on
if (Excess_demand/eta_rec <= P_DE_rated)
if (Excess_demand/eta_rec >= P_DE_min)
P_DE(t) = Excess_demand/eta_rec;
% No dumped load
else
P_DE(t) = P_DE_min;
P_dump(t) = P_DE_min - Excess_demand/eta_rec;
% If we allow excess generator output to charge battery
if (soc_LI(t) < SOC_max_LI)
if (P_dump(t) <= P_max_LI)
soc_LI(t+1) = max(SOC_min_LI,soc_LI(t+1))*(1-delta_hour) + P_dump(t)*delta_t*(eta_overall/E_C);
P_dump(t) = 0;
else
soc_LI(t+1) = max(SOC_min_LI,soc_LI(t+1))*(1-delta_hour) + P_max_LI*delta_t*(eta_overall/E_C);
P_dump(t) = P_dump(t) - P_max_LI;
end
end
end
else
P_DE(t) = P_DE_rated;
P_lost(t) = Excess_demand/eta_rec - P_DE_rated;
end
if (t ~= 1 && DE_ON(t-1) == 0) % i.e. DE was offline in the last/most recent time step
DE_startup = DE_startup + SUC_DE;
% Ramp_actual = (Excess_Demand - P_DE(t-1))/60 % actual ramp rate (W/min)
end
else
DE_ON(t) = 0; % Turn DE off
if (t ~= 1 && DE_ON(t-1) == 1) % i.e. DE was online in the last/most recent time step
DE_shutdown = DE_shutdown + SDC_DE;
end
end
end
fuel_DE = 0.06 * P_DE_rated + 0.0246 * P_DE(t); % fuel consumption (L/h) where P is in kW - source?
C_fuel_DE = C_fuel_DE + 3.20 * (fuel_DE / 3.78541); % Diesel fuel cost assuming a price of $3.20/US liquid gallon (value for Tanzania from NREL ReOpt)
% Alternatively, can model assume fuel consumption cost to be quadratic function of DE power output (Parisio et al. 2014 and others)
% But need to find right coefficients by data fitting
CO2 = CO2 + 3.5 * fuel_DE; % Total CO2 emissions (kg) using emission factor of 3.5 kg/L of diesel - source?
end
if (DE_ON(1) == 1)
DE_startup = DE_startup + SUC_DE;
end
% Upon completion of for loop i.e. after iterating through all hours of the year, C_fuel_DE now gives the total fuel cost over the 1st year of MG operation
% It is assumed that on average, the annual fuel cost remains constant for all subsequent years of the system's lifetime
Var_OM_DE = Variable_OM_DE * sum(DE_ON);
% Total initial capital/installed cost
IC = IC_s + IC_w + IC_LI + IC_DE + IC_inv;
% Total annual recurring costs each year
C_rec = OM_s + OM_w + OM_LI + Fixed_OM_DE + Var_OM_DE + C_fuel_DE;
% Present worth of recurring costs
PW_rec = C_rec * (((1+f)/(1+i))*(((1+f)/(1+i))^t_overall - 1))/(((1+f)/(1+i)) - 1);
% Battery replaced every 10 years
i_adj_LI = (((1+i)^t_LI)/(1+f)^(t_LI - 1)) - 1; % Adjusted nominal interest rate
PW_LI_rep = RC_LI * (((1+f)/(1+i_adj_LI))*(((1+f)/(1+i_adj_LI))^t_overall - 1))/(((1+f)/(1+i_adj_LI)) - 1);
% DE replaced every 5 years
i_adj_DE = (((1+i)^t_DE)/(1+f)^(t_DE - 1)) - 1; % Adjusted nominal interest rate
PW_DE_rep = RC_DE * (((1+f)/(1+i_adj_DE))*(((1+f)/(1+i_adj_DE))^t_overall - 1))/(((1+f)/(1+i_adj_DE)) - 1);
% Present worth of non-recurring costs
PW_nonrec = PW_LI_rep + PW_DE_rep;
TNPC = IC + PW_rec + PW_nonrec; % Total (lifecycle) net present cost of system ($)
TAC = TNPC * CRF; % Total annualized cost ($)
E_gen = sum(P_DE + P_RES); % Total annual electrical energy = P_gen * delta_t = P_gen (in kWh) since delta_t = 1 h
LCOE = TAC/E_gen; % Energy cost/Levelized cost of electricity ($/kWh)
% Emissions factors - EPA database (all in g)
% Alternative source: Wu et al. 2014
CO = 4.063288937 * sum(P_DE);
NOx = 18.85658039 * sum(P_DE);
SO2 = 0.007381439 * sum(P_DE);
VOC = 1.502443664 * sum(P_DE);
PM = 1.338208931 * sum(P_DE);
PM10 = 1.338208931 * sum(P_DE);
PM25 = 1.338208931 * sum(P_DE);
Emissions = CO2 + (CO + NOx + SO2 + VOC + PM + PM10 + PM25)/1000;
Emissions = Emissions/Emissions_base; % Always lies between 0 and 1
% Reliability measure - % of load that's not not met
DPSP = sum(P_lost)/sum(sum(Load));
% Excess/dump energy as a fraction of total generation
Dump = sum(P_dump)/E_gen;
% Renewable penetration
REF = sum(P_RES)/E_gen;
% time = 1:1:8760;
% plot(time, P_RES);
Costs = [LCOE Emissions DPSP Dump -REF];
w = [0.2 0.2 0.2 0.2 0.2]; % Weights of different cost terms
cost = Costs * w';