Critical Path Solver

(This is a work in progress ATM)

The Critical Path Method is used in many project management applications.

Goals

  • Solve the Critical Path Method with Activity on Node
  • Generate a directed diagram as pdf file
  • Generate a summary of the program
  • Return a list of critical activities
  • Support modelling of activities with the following relationships:
    • Start to Finish
    • Start to Start
    • Finish to Start
    • Finish to Finish
  • Use as the basis for an API

Solvers

  • Critical-Path Method
  • Topological Sorting
  • Dijkstra's Algorithm
  • Floyd-Warshall Algorithm

Current Performance

  • Critical-Path Method: O(V + E)
  • Topological Sorting: O(V + E)
  • Dijkstra's Algorithm: O((V + E) log V)
  • Bellman-Ford Algorithm: O(VE)
  • Floyd-Warshall Algorithm: O(V^3)
+----------------------------------------------------+
| Performance Results (250 activities, 5 iterations) |
+----------------+-----------+-----------+-----------+
| Solver         | Avg (ms)  | Min (ms)  | Max (ms)  |
+----------------+-----------+-----------+-----------+
| Critical-Path  | 0.61      | 0.38      | 1.37      |
| Bellman-Ford   | 84.2      | 83.38     | 85.39     |
| Floyd-Warshall | 2566.75   | 2536.2    | 2640.7    |
| Topological    | 0.65      | 0.63      | 0.7       |
| Dijkstra       | 6.34      | 6.18      | 6.46      |
+----------------+-----------+-----------+-----------+

+----------------------------------------------------+
| Performance Comparison (relative to Critical-Path) |
+--------------------------+-------------------------+
| Solver                   | Relative Speed          |
+--------------------------+-------------------------+
| Bellman-Ford             | 138.31x slower          |
| Floyd-Warshall           | 4216.08x slower         |
| Topological              | 1.07x slower            |
| Dijkstra                 | 10.41x slower           |
+--------------------------+-------------------------+

References:

Example Output

+-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------+
|                                                                            Program: HBR Program                                                                             |
+-----+-----------------------------------------------------+----------+-------+----------+--------------+------------+-------------+--------------+------------+-------------+
| Ref | Name                                                | Duration | Slack | Critical | Predecessors | Successors | Early_Start | Early_Finish | Late_Start | Late_Finish |
+-----+-----------------------------------------------------+----------+-------+----------+--------------+------------+-------------+--------------+------------+-------------+
| a   | Start                                               |    0     |   0   | true     |              | b          | 0           | 0            | 0          | 0           |
| b   | Excavate and pour footers                           |    4     |   0   | true     | a            | c          | 0           | 4            | 0          | 4           |
| c   | Pour concrete foundation                            |    2     |   0   | true     | b            | d f r      | 4           | 6            | 4          | 6           |
| d   | Erect wooden frame including rough roof             |    4     |   0   | true     | c            | e i j      | 6           | 10           | 6          | 10          |
| e   | Lay brickwork                                       |    6     |   8   | false    | d            | p          | 10          | 16           | 18         | 24          |
| f   | Install basement drains and plumbing                |    1     |   1   | false    | c            | g h        | 6           | 7            | 7          | 8           |
| g   | Pour basement floor                                 |    2     |   1   | false    | f            | j          | 7           | 9            | 8          | 10          |
| h   | Install rough plumbing                              |    3     |   4   | false    | f            | k          | 7           | 10           | 11         | 14          |
| i   | Install rough wiring                                |    2     |   2   | false    | d            | k          | 10          | 12           | 12         | 14          |
| j   | Install heating and ventilating                     |    4     |   0   | true     | d g          | k          | 10          | 14           | 10         | 14          |
| k   | Fasten plaster board and plaster (including drying) |    10    |   0   | true     | i j h        | l          | 14          | 24           | 14         | 24          |
| l   | Lay finish flooring                                 |    3     |   0   | true     | k            | m n o      | 24          | 27           | 24         | 27          |
| m   | Install kitchen fixtures                            |    1     |   1   | false    | l            | t          | 27          | 28           | 28         | 29          |
| n   | Install finish plumbing                             |    2     |   0   | true     | l            | t          | 27          | 29           | 27         | 29          |
| o   | Finish carpentry                                    |    3     |   2   | false    | l            | s          | 27          | 30           | 29         | 32          |
| p   | Finish roofing and flashing                         |    2     |   8   | false    | e            | q          | 16          | 18           | 24         | 26          |
| q   | Fasten gutters and downspouts                       |    1     |   8   | false    | p            | v          | 18          | 19           | 26         | 27          |
| r   | Lay storm drains for rain water                     |    1     |  20   | false    | c            | v          | 6           | 7            | 26         | 27          |
| s   | Sand and varnish flooring                           |    2     |   0   | true     | o t          | x          | 32          | 34           | 32         | 34          |
| t   | Paint                                               |    3     |   0   | true     | m n          | s u        | 29          | 32           | 29         | 32          |
| u   | Finish electrical work                              |    1     |   1   | false    | t            | x          | 32          | 33           | 33         | 34          |
| v   | Finish grading                                      |    2     |   8   | false    | q r          | w          | 19          | 21           | 27         | 29          |
| w   | Pour walks and complete landscaping                 |    5     |   8   | false    | v            | x          | 21          | 26           | 29         | 34          |
| x   | Finish                                              |    0     |   0   | true     | s u w        |            | 34          | 34           | 34         | 34          |
+-----+-----------------------------------------------------+----------+-------+----------+--------------+------------+-------------+--------------+------------+-------------+

HBR Program.pdf

Contributing

Bug reports and pull requests are welcome on GitHub at https://github.com/[USERNAME]/cpm_solver. This project is intended to be a safe, welcoming space for collaboration, and contributors are expected to adhere to the code of conduct.

License

The gem is available as open source under the terms of the MIT License.

Releases

No releases published

Packages

No packages published